MISC Berhad Facility: LNG FSU 2

Client : MISC Berhad Facility: LNG FSU 2

  • Work executed in Malaysia MHB Shipyard and on voyage from MHB Shipyard to Malacca Re-gasification Terminal (RGT) Sungai Udang.
  • Scope of Work – Bottom Shell Plating Renewal
    • Utilising SPS Overlay so that no cutting through the bottom shell plating is required, therefore avoid the need to go into a drydock
    • Injection scope of work carried out by trained injection engineer

Related Articles