

Client : MISC Berhad Facility: LNG FSU 2
- Work executed in Malaysia MHB Shipyard and on voyage from MHB Shipyard to Malacca Re-gasification Terminal (RGT) Sungai Udang.
- Scope of Work – Bottom Shell Plating Renewal
- Utilising SPS Overlay so that no cutting through the bottom shell plating is required, therefore avoid the need to go into a drydock
- Injection scope of work carried out by trained injection engineer